This project was part of the Waste water treatment plant upgrade works at the Wooroloo Prison Farm. DCL Contracting were awarded the contract to preform earthworks and in-situ concrete works for the construction of two new in-situ concrete waste water tanks.
The works undertaken by DCL included but not limited to the following:
– Excavation
– Raft Footings
– In-situ Sumps
– Radius Walls
– Subsoil Drainage
– Backfill and Compaction