Water Corporation: Wooroloo Prison Farm

This project was part of the Waste water treatment plant upgrade works at the Wooroloo Prison Farm. DCL Contracting were awarded the contract to preform earthworks and in-situ concrete works for the construction of two new in-situ concrete waste water tanks.
The works undertaken by DCL included but not limited to the following:

– Excavation
– Raft Footings
– In-situ Sumps
– Radius Walls
– Subsoil Drainage
– Backfill and Compaction