Services

Projects

Sectors

Get in Touch

INJUNE WAY BRIDGE CONSTRUCTION

Project :
INJUNE WAY BRIDGE CONSTRUCTION
Sector :
Government & Transport Infrastructure
Service :
Bridge Construction
Location :
Joondalup
Client :
Coleman Rail
Year :
2020
Project Summary :

A new road and pedestrian bridge extending the existing roadway at Injune Way over the Joondalup railway line. The bridge provides access to a future phase of the retail/industrial development at the Joondalup Business Park South Stage 4 project and has been designed to accommodate two lanes of traffic and a pedestrian footpath on the south side of the road to match the existing road and footpath configuration on Injune Way.

The project had several involved ongoing stakeholder consultations with the Public Transport Authority (PTA), Main Roads WA (MRWA) and the City of Joondalup to ensure their technical criteria and safety requirements have been incorporated within the design.

DCL’s scope included:

  • Earthworks
  • Formwork, Reinforcement and Concrete Placement
  • MSE Panel Installation & Backfill
  • Bearing Installation
  • Pre-cast Tee-Roff Installation
  • Expansion Joint Installation
  • Scaffolding

Explore More Projects

Let’s Start the Conversation !

Have a project in mind? Get in touch with our team today