The old timber bridge was built 99 years ago and had a 5-tonne load limit. Replacing it with a modern concrete and steel structure will ensure it is suitable for all standard vehicles and provide upgraded shared path facilities. It will optimise the road network for local traffic access and pedestrian and cyclist facilities into the future.
Work includes:
Have a project in mind? Get in touch with our team today