The “FMG Cloudbreak Far West Conveyor CV010 OLC Overpass Tunnel” refers to a specific component of Fortescue Metals Group’s (FMG) Biggie Crushing and Conveying Project at the Cloudbreak mine in Western Australia. The project involved the design and construction of a 10km Overland Conveyor System (CV010) to connect the Far West Project to the existing mine infrastructure, which included designing detailing for various elements like head and tail ends, transfer points, and importantly, a Heavy Vehicle Overpass Tunnel to allow equipment and vehicles to cross beneath the conveyor.
DCL’s scope included:
Have a project in mind? Get in touch with our team today