Services

Projects

Sectors

Get in Touch

GNH BRIDGE CONSTRUCTION (BRIDGE NO 1832)

Project :
GNH BRIDGE CONSTRUCTION (BRIDGE NO 1832)
Sector :
Government & Transport Infrastructure
Service :
Bridge Construction
Location :
GNH
Client :
Acciona Clough Joint Venture (ACJV)
Year :
2019
Project Summary :

Acciona Clough Joint Venture (ACJV) were contracted by Main Roads WA, to complete the construction of the Great Northern Highway Road over rail bridge, the access road, and intersection for the Gudai-Darri mine in the Pilbara region. The project gave access to the new Gudai-Darri mine for key business through the construction of a new road and new rail line and connected the mine to the existing Rio Tinto Iron Ore rail networks. This allowed for the transportation of iron ore to either Dampier or Cape Lambert.

The project involved the construction of a 3.6 km of road for the approaches to the bridge over rail, the construction of the bridge over rail, mechanically stabilised earth abutment walls, the T-Roff beam installation for the bridge deck, all associated drainage, pavement and road furniture, the delivery of two bulk earthwork bridge embankments and construction of side road upgrades of the Great Northern Highway and Gudai-Darri Mine Access Road (KMAR) intersection.

DCL’s scope included:

  • In-situ concrete works
  • MSE Precast Installation and backfill
  • Scaffolding
  • Labour & Plant Hire

Explore More Projects

Let’s Start the Conversation !

Have a project in mind? Get in touch with our team today