PTA: Bayswater Train Station Pedestrian Bridge

The Public Transport Authority (PTA) carried out upgrade works on the Principle Shared Path connection adjacent to the southern side of the existing Bayswater Train Station. DCL Contracting were awarded the contract to carry out works on the construction of a PSP bridge to span the existing underpass, which included the following elements:

– Concrete Footings
– Retaining Walls
– Concrete Abutments
– Installation of Precast Beams
– Installation of Parapets
– Concrete Slabs

The project site was located within a rail reserve with live traffic and high-voltage overhead power lines. Strict safety management parameters and effective pedestrian and vehicle interface management were required at all times.