PTA: Perth City Link

The $360 million Perth City Link rail project was delivered as an alliance consisting of the Public Transport Authority, John Holland and GHD. The scope involved sinking a 600-metre section of the Fremantle rail line to reconnect the CBD with Northbridge, a new pedestrian underpass connecting Perth and Perth Underground stations, and major upgrade works … Read more

PTA: Aubin Grove Train Station

Aubin Grove Train Station and Russell Road Upgrade was awarded to Georgiou. Designed to cater for the growing communities in Perth’s southern suburbs, the interchange station was the first island rail platform to be built within a “live rail” environment in Western Australia. DCL Contracting Group were approached by Georgiou to carry out drainage and … Read more

MRIA: Murdoch Drive Underpass

An extension of Murdoch Drive south from Farrington Road to connect with Roe Highway and Kwinana Freeway makes up the $100 million Murdoch Drive Connection project. DCL Contracting were awarded the contract to construct the in-situ reinforced concrete members of a trapezoidal underpass. Once the construction of the in-situ concrete was complete DCL Contracting assisted … Read more

MRWA: Williams River Bridges Replacements

Based in regional Western Australia, this project involved the construction of two new replacement road bridges over the River Williams for Main Roads WA. With formed abutments, wingwalls and piers (including headstocks), constructed from piled foundations, the bridge deck comprised a concrete topping slab on precast girder beams. Additionally, a new weir was constructed along … Read more

MRWA North Link: Stage #1

DCL Contracting was part of the North Link Stage #1 project from inception to completion, undertaking the following construction activities across the two-year duration. JHG Compound and Site Establishment – CFA Noise Wall Footings – Noise Wall Installations – Insitu Retaining Wall Construction – Site Cleaning and Emubobbing – General Labour Supply Our ongoing presence … Read more

Water Corp: Ellenbrook 80ML Supply Tank

This project involved the design and construction of a main water supply tank for the suburb of Ellenbrook. Built to a 100-year lifespan, the works entailed in-situ concrete construction of the following elements: – Post-tensioned ring beam foundation – 12m high in-situ stitch wall panel infills to precast elements – Internal concrete plinths and columns … Read more

PTA: Bayswater Train Station Pedestrian Bridge

The Public Transport Authority (PTA) carried out upgrade works on the Principle Shared Path connection adjacent to the southern side of the existing Bayswater Train Station. DCL Contracting were awarded the contract to carry out works on the construction of a PSP bridge to span the existing underpass, which included the following elements: – Concrete … Read more

MRWA: Hamilton Street Bridge Replacement

The old timber bridge was built 99 years ago and had a 5-tonne load limit. Replacing it with a modern concrete and steel structure will ensure it is suitable for all standard vehicles and provide upgraded shared path facilities. It will optimise the road network for local traffic access and pedestrian and cyclist facilities into … Read more